Below are some photographs that we have taken of works during various stages of the project. Feel free to click the preview image to see a higher quality version, and click the square thumbnails to change the image in the preview window.
Front Door
Replacement of timber front door, ironmongery and painted to complete.
December 2019
- Mr Woodland
Cloakroom Uplift
Cloakroom uplift, maintenance and tiled splash back
November 2019
- Homes 2 Inspire
Amtico Flooring
Removal of existing carpet. Prepping and boarding of all floor areas. Supply and fitting of flooring to entire ground floor of property: hallway, dining room, kitchen, utility, lounge and cloakroom.
November 2019
- Homes 2 Inspire
Fitted Wardrobes
Construction of fitted wardrobes with storage and hanging rails. Prepping and painting of timbers. Fitting of sliding doors to complete.
November 2019
- Mr and Mrs Foster
Bathroom / Wet room Installation
Includes plastering, tiling, wet room flooring and towel radiator.
October 2019
- Mr & Mrs Summerill